Concrete Invoice Template: Free PDF & Word

A concrete invoice records the slab or other work placed, the completed finish, and the amount due under the agreed terms. Build the bill from the actual layout, delivery tickets, and approved scope changes. Keep the payment summary simple enough for the customer to reconcile.

Example invoice

Patio Slab — 20x16, 4 in. Thick

Illustrative quantities and USD prices. Replace them for your job.

DescriptionQtyUnit priceAmount
Excavation and base prep320 sf$1.50$480.00
Concrete (4000 PSI)4 yd$165.00$660.00
Fiber mesh reinforcement4 yd$12.00$48.00
Form boards and stakes1 set$120.00$120.00
Labor — pour, finish, broom texture6 hr$110.00$660.00

Example subtotal before tax: $1,968.00

Bill what was formed, placed, and finished

Identify the job address, invoice number, bill date, and due date. Give the pour or service date separately. Where one site contains a patio, walkway, and equipment pad, identify the exact work covered by this bill. Reference the accepted proposal or change order. Use a short description such as rear patio, 20 by 16 feet, broom finish, instead of a generic concrete services entry that could match any visit.

Put the units used in the agreement on the bill. The sample has 320 square feet of excavation and base prep, four cubic yards of ready-mix, a reinforcement additive, form materials, and labor for placement and finish. If the customer bought an installed square-foot price, the batch ticket supports the job record but does not set the amount due by itself. If delivery or material is billed by the cubic yard, use the authorized quantity and retain the ticket.

Use the job record to verify closeout tasks. Show what was included in form removal, washout cleanup, and final site handover when those details matter. If access remains blocked or there is an agreed return visit, identify it separately rather than implying the entire site is ready. Describe which finish the customer received and the applicable handover instructions. Keep manufacturer or mix documentation attached to the job as needed.

Reconcile added prep and the amount due

Suppose the accepted sample totals $1,968. The owner authorizes 80 square feet of added base preparation outside the original scope at an illustrative $1.50 per square foot. Add one $120 line that names the location and cites the approval. The example revised charge is $2,088. If a $500 deposit was collected and applied to this job, the balance is $1,588 before any separate items. Show the deposit below charges and include its payment date.

Keep a separate record for materials that affected your costs without changing the customer’s charge. If the supplier added a waiting charge and you quoted a fixed price without an approved adjustment, record it in job costs. If the customer approved an added pump or access fee, list what it covered and when it was approved. This prevents a surprise line that the owner cannot match to the project conversation.

Review credits as carefully as additions. If part of the work was removed from the scope, note the agreed scope credit and its reference. If the customer pays in stages, show the present amount being billed and preserve the running ledger. A final bill can summarize the total for the patio, prior charges, received payments, and the balance without charging earlier work again.

Send payment confirmation and retain the pour records

Give the payer clear instructions and ask them to reference the invoice number on the payment. If a builder is paying and the property owner needs the closeout, send the appropriate information to each contact. Include the agreed return visit and any outstanding work in the project record. Avoid calling the balance paid until the payment is confirmed, especially if a check is still in transit or a bank transfer is pending.

Send a receipt after confirmation. Include the amount, payment date, and invoice number. If a payment was split into a deposit and a final check, show the two amounts and the remaining balance. Keep the accepted estimate, ready-mix ticket, documented changes, and paid invoice together. If the customer later asks about what mix was delivered or which area the crew placed, you can locate the correct record.

When issuing a correction, explain whether it replaces the original bill or records a credit against it. For instance, a duplicate materials entry should be removed or credited according to your bookkeeping process. Send a corrected balance and make the relationship to the first invoice clear. A project with separate pours can have several similar invoices, so keep the site area and dates visible on each.

For a subcontracted pour, ask the crew lead for the finish area, site notes, and the time the work was accepted before sending the bill to the builder. A concrete delivery receipt records the truck’s arrival and material. The site signoff connects that delivery to the work performed.

See the concrete estimate template

New invoices created from estimates and online customer payments are temporarily unavailable in the paid workspace. This free template and PDF generator remain available.

Frequently asked questions

Should I attach the batch ticket?

Keep it with the job record and provide it when the agreement or customer requires it. The invoice should still summarize the completed scope, quantities used for billing, and the balance.

How do I bill a slab poured on a different day than planned?

Use the actual service date and any agreed schedule adjustment. Distinguish the date of the work from the date the invoice is issued.

What proves a concrete invoice was paid?

A receipt or paid copy can show the amount received, date, and invoice it was applied to. Keep any remaining balance clear for partial payments.

Start with these line items and make them yours.

Fill in this invoice online