Plumbing Invoice Template: Free PDF & Word
This plumbing invoice template turns completed service into a billing record for the person who owes the balance. Use the actual visit date and installed parts, even when they differ from the original kitchen estimate. A property manager may file this record by unit, and a homeowner may look for it months later when identifying a fixture or reporting a leak.
Example invoice
Kitchen Sink & Disposal Replacement
Illustrative quantities and USD prices. Replace them for your job.
| Description | Qty | Unit price | Amount |
|---|---|---|---|
| Remove existing sink and disposal | 1 job | $185.00 | $185.00 |
| Moen Edwyn pull-down kitchen faucet | 1 ea | $289.00 | $289.00 |
| InSinkErator Badger 5 disposal | 1 ea | $119.00 | $119.00 |
| PVC drain assembly and fittings | 1 set | $47.00 | $47.00 |
| Supply lines (braided stainless) | 2 ea | $14.00 | $28.00 |
| Labor — install and test | 3 hr | $125.00 | $375.00 |
Example subtotal before tax: $1,043.00
Record the plumbing work that was completed
Give the invoice its own number and include the customer name, billing address or contact, and the service location. An address alone can be ambiguous in an apartment building, so specify the unit and fixture. Add the visit date and reference the approved estimate or work order. A description such as “replace kitchen faucet and disposal in Unit 3B” makes the charge easier to match than a generic service call.
Build the item list from the technician’s job notes. A faucet line can name the manufacturer and model that went in. A disposal line can identify the unit and indicate whether its cord was included. Enter the number of connectors actually used and the drain assembly installed. If the customer bought the faucet directly, identify it as owner-supplied in the job description and leave the purchase price off your charges. Note that the old fixture was removed only if that work was done.
Describe the completed checks in plain language. A useful closeout note might say you ran water at both taps, checked the supply connections and trap under flow, and tested the disposal. Keep observations about other equipment distinct. If a slow branch drain was outside the job, record the observation and any proposed next visit without adding a charge for work that was not performed.
Show approved changes, deposits, and the balance
Use an example fixture job to check the totals. Suppose the approved work was $1,043 and the customer approved an additional $110 to replace a shutoff that would not isolate the faucet. Those illustrative amounts produce $1,153 before any applicable tax. A $300 deposit already received leaves $853 due in this example. Keep the $110 change visible as a line with its approval reference and record the $300 against the amount owed instead of discounting the faucet.
Where the agreement separates removal and installation, retain those labels so the customer can reconcile the invoice. If you substituted a fixture, identify the installed model and show a credit or new amount only as agreed. A change approved by phone can be identified with the date and person who authorized it in your records. If a requested extension to the job has no approval, discuss it with the payer before adding it to a final invoice.
Check which payments actually cleared and verify that any credit references the right job. A property manager might send one payment for work in two units. Allocate the amount across the correct invoices before sending a balance reminder. Where you accept bank transfer, check, or online payment, list the available method and the due date agreed for this invoice. Give the customer a document number to include with payment so you can reconcile it.
Close out a service invoice and issue a receipt
A final invoice should make it clear whether a return trip is planned. If you temporarily restored water and still need to install an ordered part, bill only the portion due under the agreement and identify the open work. If the job is complete, record the finish date and include any product information or agreed workmanship terms you intend the customer to keep. Document what was left with the customer, such as a fixture care sheet or unused finish trim.
When payment is received, issue a receipt or paid copy that shows the date, amount, and remaining balance. If the customer paid $500 of the example $853 balance, the paid amount for this transaction is $500 and $353 remains due. Keep the earlier deposit in the payment history so the two payments can be reconciled. If a card payment is still processing, verify its status before you mark the entire invoice paid.
Review the service address and email address before delivery. Work for an owner and work for a tenant may have different contacts, even at the same property. Send the billing copy to the person responsible for payment and retain the approved estimate, service notes, and payment record together. For a paid callback, create a separate dated record so it is clear which visit generated the charge and which invoice is already settled.
See the plumbing estimate template
New invoices created from estimates and online customer payments are temporarily unavailable in the paid workspace. This free template and PDF generator remain available.
Frequently asked questions
How do I invoice a customer-supplied faucet?
State that the faucet was supplied by the customer and bill the agreed labor and any parts you provided. Record the installed model when available, so the invoice remains useful for future service.
What if the final repair is smaller than the plumbing estimate?
List the work actually performed and apply the price or credit agreed for the reduced scope. Reference the original estimate and show any deposit already applied so the customer can reconcile the difference.
Start with these line items and make them yours.
Fill in this invoice online