Flooring Invoice Template: Free PDF & Word
Use the flooring invoice template after the crew installs the floor or completes an agreed stage. List the rooms, installed product, and finish work, then reconcile material purchases, approved prep, and payments. Keep open items distinct from the floor the customer is already using.
Example invoice
LVP Install — Living Room (400 sf)
Illustrative quantities and USD prices. Replace them for your job.
| Description | Qty | Unit price | Amount |
|---|---|---|---|
| Remove existing carpet and pad | 400 sf | $1.25 | $500.00 |
| CoreTec Pro Plus LVP | 440 sf | $4.50 | $1,980.00 |
| Underlayment (included with LVP) | 0 sf | $0.00 | $0.00 |
| Transitions and quarter round | 1 lot | $120.00 | $120.00 |
| Labor — install | 400 sf | $2.50 | $1,000.00 |
Example subtotal before tax: $3,600.00
Confirm the installed flooring and billing fields
Use a unique invoice number and provide the issue date, due date, customer name, and job address. Reference the accepted flooring estimate and list the dates the crew worked. If you billed a separate removal visit, identify that invoice so the same work does not appear twice. Put the room names on the invoice. On the sample job, the living room received 400 square feet of luxury vinyl plank after the existing carpet and pad came out.
Use the product that actually went in. List the series, color, and relevant product code when available, plus the actual thresholds or trim installed. The installer’s carton count can support a billed material order, while the finished area supports a labor line billed by installed square footage. If the customer supplied the plank, identify it as owner-provided so the material is documented without charging for purchase. Keep underlayment and accessories consistent with the completed work.
Check completion before preparing the final copy. If the crew is waiting for a matching reducer or must return for trim at a doorway, identify the open item and bill according to the agreed milestone. Separate the notes from line items. A homeowner may want the floor color and care information, while a property manager may need unit numbers or a purchase order. Both should be able to reconcile the charges.
Account for preparation, credits, and floor payments
The sample estimate adds to $3,600 before any separate charges. Suppose removing carpet revealed a low area, and the owner approved preparation of 30 square feet at an example $3.50 per square foot. Add the $105 change with its reference and location. If an agreed $35 transition was removed from scope, show that credit. The revised example charge is $3,670. Apply a recorded $900 deposit once and show a $2,770 balance.
Do not automatically bill a preparation charge based on the amount of patching material your crew purchased. Use the price and units the customer approved. A fixed preparation fee and a measured-area fee are different ways to bill the same activity. If you return an unopened carton, follow the accepted treatment of surplus and returns. Preserve the vendor receipt and any distinct customer credit so the accountant can see which amount belongs on this job.
List labor, removal, and finish items at the agreed level of detail. If the quote covered a single installed price, use that approved package and show what it includes. Where the customer chose between products, document the final selection and adjustment. A partial payment after removal should appear in the invoice history. Use the account balance, rather than a repeat of the package amount, in the payment instructions.
Give the customer a paid record and the floor details
Confirm who receives the bill and how the customer should reference the invoice on payment. If the building owner is paying and a tenant was present at installation, send billing and care information to the appropriate contacts. Note where you left spare planks and matching accessories if the customer retained them. Label the separate care sheet with the installed product, since maintenance instructions can differ between floors.
After confirming the payment, issue a receipt or update the paid copy with amount received, method or reference, date, and remaining balance. If the customer pays a deposit and final balance separately, both belong in the job history. Keep the supplier invoice, order or lot identifiers if relevant, approved changes, and completion photos. That makes it easier to identify a matching replacement later.
Send any correction with a clear reference to the original invoice. For example, if the trim count was entered twice, explain the adjustment and provide the updated balance. Keep notes about unfinished work separate from payment history, so a receipt for a progress payment does not read as a statement that all punch work has been resolved.
For a rental turnover, include the unit, the rooms covered, and the product installed beside the move-in date in the work record. The owner can then look up the right material without confusing a living room repair with an older installation in another unit.
See the flooring estimate template
New invoices created from estimates and online customer payments are temporarily unavailable in the paid workspace. This free template and PDF generator remain available.
Frequently asked questions
Should the invoice show installed area or purchased area?
Use the unit agreed for each line. Show installed area on labor sold by installed square footage, and purchased or approved ordered quantity for a separate material charge.
How should I record leftover plank?
Identify any spare boxes or pieces left on site and whether there is an agreed return credit. Keep that note tied to the installed product and the customer’s decision.
Can I use a paid flooring invoice as proof of purchase?
A paid invoice can document the charge and confirmed payment. Include the product, invoice number, payment date, and amount and retain the separate supplier record if applicable.
Start with these line items and make them yours.
Fill in this invoice online